My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP45367
DRMS
>
Back File Migration
>
Report
>
REP45367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:48:04 AM
Creation date
11/27/2007 10:34:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993041
IBM Index Class Name
Report
Doc Date
12/7/1994
Doc Name
DOWE FLATS MINING AND RECLAMATION PROJECT SOUTHDOWN INC
From
LANDSCAPE RESOURCE ECOSYSTEM PLANNING INC
To
BOULDER CNTY DEPT OF TRANSPORTATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />999 <br />LREP <br />Landscape, Resource, Ecosystem Planning, Inc. <br />2635 Mapleton Ave., #77 • Boulder, CO 80304 <br />(303) 447-1899 • FAX (303) 545-9415 RECEIVF_ D <br />November 4, 1994 DEC p ~ 19~ <br />Boulder County Department of Transportation Ot ~tsion of rvfinerals & ~epiugy <br />PO Box 471 <br />Boulder, CO 80306 <br />Re: Dowe Flats Mining and Reclamation Project, Southdown, Inc. <br />Dear Preston, <br />Thank you for the meeting on Monday, October 31, 1994. I appreciate your attendance as <br />well as that of Curt Parker and Wayne Ellis from BDOT, and Jeff Moline from POSD. <br />Representing Southdown was John Lohr, Gerald Anderson, Darrel Buffington, Don Van <br />Buskirk, and Mike Figgs. <br />We discussed the following technical items of interest to BDOT and POSD: <br />1. conveyor alignment from cement plant to Ute Highway <br />2. haul road alignment from cement plant to Ute Highway <br />3. filling a gravel pit in the haul road corridor, starting before the end of November <br />4. constructing a bridge pier and abutments for the haul road crossing on St. Vrain Creek, <br />starting before the end of November <br />5. constructing three box culverts and one bridge crossing on the four irrigation ditches <br />north of Ute Highway for the haul road, starting before the end of November. These <br />ditches are Palmerton, Rough and Ready, Highland (which requires a bridge because <br />of the large size of the ditch), and Supply ditches respectively, from south to north <br />6. local access easements after the vacation of County Road 49 <br />Southdown wants to fill in the gravel pit (as described in the grading permit), construct the <br />St. Vrain bridge pier and abutments (as described in the floodplain permit), and construct <br />the four irrigation ditch crossings while the water table is low and the ditches are dry during <br />the winter months. <br />The actual grading and construction for the road bed on the haul road will not will begin <br />until March or April of 1995. We also anticipate a similar time frame for construction of <br />the cross members and road bed on the St. Vrain Creek bridge. <br />(over) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.