Laserfiche WebLink
Preston Douglas <br />Dowe Flats Mining and Reclamation Project <br />November 4, 1994 <br />Page 2 of 2 <br />Southdown agreed to the following: <br />as the final alignments for the haul road and conveyor aze determined, they wil] be <br />submitted to the appropriate County depart rents <br />2. prior to pier construction, final St. Vrain Creek bridge engineering drawings, when <br />completed, will be submitted to the appropriate County departments as required by the <br />floodplain permit <br />3. notify the Land Use Department of the meeting, and describe the discussions that took <br />place <br />4. send a project conswction schedu]e to the appropriate County departments <br />BDOT agreed to inform Southdown as to the nature of the bridge closing on County Road <br />49. <br />Thank you for your assistance. If you have a,ty questions or comments, please contact me <br />(at the letterhead phone number) or John Lahr at the cement plant (823-6685), <br />Sincerely, <br />~~, <br />Michael G. Figgs <br />encl. project construction schedule <br />ce: Rosi Koopman, Land Use Department <br />Curt Parker, BDOT <br />Wayne Ellis, BDOT <br />Jeff Moline, Parks and Open Space Department <br />Rich Koopman, Parks and Open Space; Department <br />John Lohr, Southdown, Inc. <br />Paul Banks, AGRA Earth and Environmental <br />