Laserfiche WebLink
Page 1 of 2 <br />Walker, Byron <br />From: Walker, Byron <br />Sent: Tuesday, March 13, 2007 12:10 PM <br />To: Kaldenbach, Tom <br />Cc: Hernandez, Dan <br />Subject: 2006 Annual Hydrologic Report, Foidel, C-1982-056 <br />Hi Tom, this is in addition to my earlier request for review support of the Foidel 2006 Annual Hydrological Report. I <br />have divided this review into two parts. The first part just reviews the requirements of the report. The second <br />addresses compliance of the monitoring program with the rules, and analysis as has been done in the past. <br />With regard to the first part: <br />Hydrologic monitoring data is to be submitted to the Division as required by Rule 4.05.13(4)(c). <br />Rule 4.05.13(4)(c) A hydrologic report shall be The report is in compliance with this rule. The 2006 <br />submitted to the Division annually with the Annual Hydrological Report was due on 28 February <br />date of submittal determined in consultation 2007. It was received at the Division on 27 February <br />with the permittee. The annual hydrologic 2007. <br />re ort shall contain at a minimum: <br />Rule 4.05.13(4)(c)(i) Water quantity data The report is not in complete compliance with this <br />obtained from each monitoring site during the rule. <br />water ear; <br />Rule 4.05.13(4)(c)(ii) Water quality data The report is not incomplete compliance with this <br />obtained from each monitoring site during the rule. <br />water yeaz; and <br />Rule 4.05.13(4)(c)(iii) If required by the Although not required by the Division (permit), <br />Division, a written interpretation of the data some discussions are provided in the report <br />and identification of mining related impacts to <br />the h drologic balance. <br /> <br />With regard to deficiencies in complete compliance, I have the following issues: <br />Issue 1. Please include the 6 Mains North discharge point and the Fish Creek Tipple Sediment Pond <br />discharge on page 2 of the report. <br />Issue 2. Please include the Fish Creek Tipple Sediment Pond E and discharge point (Fish Creek) on page <br />2 of the report. <br />Issue 3. Please add to Section 3 of the report Point of Compliance Monitoring as required by Rule <br />4.05.13. <br />Item 4. Page 3, line 31, word 1. Should this be northeast? See Map 13. See lines 5, 6 and 20 on page 5. <br />Item 5. Please add Permit GO72272 to the list on Page 12. <br />3/13/2007 <br />