My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP37447
DRMS
>
Back File Migration
>
Report
>
REP37447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:16:18 AM
Creation date
11/27/2007 7:46:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
11/25/2005
Doc Name
October 2005 Monthly Report
From
Battle Mountain Resources Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br />November 09, 2005 <br />Mr. Alien Sorensen <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-Bg-t 1 ~ <br />October 2005 Monthly Report <br />Dear Mr. Sorensen: <br />RECEIVED <br />NOV25~. <br />lbwalnn of Minerals and Geology <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. <br />(BMRI), San Luis Project for the month of October 2005. <br />Surface and ground water monitoring and analysis were completed for all required sites during <br />the month per the terms and conditions of the TR-32 Quality Assurance and Quality Control <br />(QA/QC) Plan. <br />Vacuum on the tailing lysimeters was verified on October 27m, no water was present for sampling <br />and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and <br />the West Pit and tailings embankment monitoring wells were collected on October 30`s. October <br />tailing impoundment piezometer measurements identi£ed these installations were either dry or <br />contained less than 12 inches of water as illustrated in Table 2. Tables 1 and 2 below identify the <br />depth to water measurements collected for each of the site monitoring wells, piezometers and <br />lysimeters as required by the terms and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently during the <br />month to minimize the collection pond level. The leak detection system was measured on October <br />26"'. The October tailings pond underdrain flow average was 40.47 gpm and a total of 1290 <br />gallons of water was excavated from the leak detection system yielding a monthly average of <br />46.07 gpad. <br />During October, the West Pit water treatment plant operated efficiently discharging a total of <br />8,664,900 gallons (26.59 acre-feet) of water to Rito Seco Creek and a total of 802,700 gallons <br />(2.46 acre-feet) of water was transferred from the water treatment plant to the tailings <br />impoundment. Seepage along Rito Seco Creek remained dry during the month. The monthly <br />precipitation accumulation for October was .98" inches, with the largest accumulation occurring <br />on October, 9`" (0.35"). <br />P.O. Box 310 San Luis, Colorado 81152-D310 (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.