Laserfiche WebLink
<br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />October 2005 Monthly Report <br />Page 2 <br />Table 1-October 2005 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitorin Site Date De th to Water feet <br />M-4R 10/30/05 44.62 <br />M-6 10/30/05 D <br />M-7 10/30/05 D <br />M-8 10/30/05 D <br />M-9 10/30/05 141.93 <br />M-10 10/30/05 26.08 <br />M-11 R 10/30!05 44.74 <br />M-12 10/30/05 178.99 <br />M-13R 10/30/05 130.15 <br />M-14 10/30/05 135.73 <br />M-15 10/30/05 82.71 <br />M-16 10/30/05 22.96 <br />M-19 10/30/05 24.94 <br />M-21 10/30/05 19.06 <br />M-22 10/30/05 17.41 <br />M-26 10/30/05 17.12 <br />M-32 10/30/05 42.92 <br />M-33 10/30/05 48.17 <br />M-34 10/30/05 23.53 <br />BF-4 10/30/05 25.02 <br />BF-6 10/30/05 30.82 <br />LS-1 10/27/05 D <br />LS-2 10/27/05 D <br />LS-3 10/27/05 <br />LD-1 10/27/05 D <br />LD-2 10/27!05 D <br />LD-3 10/27/05 D <br />Table 2 -October 2005 Tailing Disposal Area Piezometer Depth to Water <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P6 10/30/05 D 72.46 0.00 <br />P7 10/30/05 D 92.50 0.21 <br />P8 10/30/05 96.71 97.51 0.80 <br />P9 10/30/05 71.74 72.30 0.56 <br />P10 10/30/05 57.35 58.30 0.95 <br />P11 IO/30/05 41.25 41.80 0.55 <br />