Laserfiche WebLink
~ ~ III IIIIIIIIIIIIIIII <br />ORCHARD VALLh;Y 1~11NL <br />.~,StQUARTERLY WASTE DISPOSAL AREA INSPECI'lON REPORT <br />NEW WEST RIDGE PILE <br />1 ~t°C~ <br />Item Y/N Comments <br />1. Quantity of waste material added to N Thcrc wa, nu gob hauled ui the waste disposal <br />waste disposal area this yuaner? pile this yuar[u. <br />2. Waste material deposited and compacted N Appnt>uma[ely half of [he uppermost l2 feet of exposed <br />in 2d" lifts'? gob ha. hccn removed and shipped out. Approximately <br /> hall ul the exposed cub remains in place. <br />3. Drainage alterations constructed? N Nu drainage ahcraliun, were cunstruc[cd during the <br /> yuartcr. The cxis[ing drainage paucrns wcrc main- <br /> tainedaround the perimeter of the exposed gob area <br /> w protect uuulupis and Uitroct drainage to ditchza at <br /> the [uc ul the pile;. <br />d. Present height of waste material? Hiehest height approximately 6J.7 feet. <br />5. New bench constructed? N <br />6. Refuse material uutslupe placed at Y Slopes were checked (or proper placement periodically <br />LV2H uutslupe? duringconstructiun. <br />7. Adequate drainage un top of completed Y Ditches were main~ained un top ul'the exposed gob to <br />fill? to crourc propu drainage I'rum the top of the pile. <br /> ~ <br />S. Bench drainage adcyuare? 1' Bench drunacc was mamtaincd thruughuu[ the yuar[er. <br />9. Outslupescoveredwith~i'nun-toxic. Y i <br />nun-cumbusublc ma[crial? <br />10. Berms cortstructed on outslupes7 Y <br />11. Evidence ul structural dclects? N I - <br />