Laserfiche WebLink
<br />OKt;}],1RD Vi1LLEY tiIINE <br />QUARTERLY WASTE DISPOSAL AREA INSPEC`T'ION REPORT <br />NEW ~`r'EST RIDGE PILE <br />[tem Y/N Comments <br />L2. Tupsoil adequately sah~aged and shred? Y Outslupe topsoil un the eastern and wuthern faces of <br /> the gob pile was dozed downslope and stored on the <br /> drainage bench below. From l2 to IS feet (vertical <br /> height) of topsoil was removed from the pile. Outslope <br /> subsoil Irom these faces was also removed and stockpile <br /> in an approved location. <br />13. Trash removed'? Y' <br />l4. Additional comments? N <br />During the lst quarter, 1992, there was no active construction un the West Ridge Waste Pile. Drainage control <br />was monitored and maintained throughout the quarter. <br />1 certify the above report as being accurate to the best of my belief and knowledge. <br />