Laserfiche WebLink
• 1 <br /> • �= • • III IIIIIIIIIIIII III <br /> W Tecl+onic <br /> September 27 , 1993 <br /> Mrs. Barbara Chiappone <br /> Division of Minerals and Geology RECE!'` E <br /> Minerals Section <br /> 1313 Sherman Street Suite 215 SEP 29 1993 <br /> Denver, Colorado 80203-2273 <br /> Dear Mrs. Chia <br /> Re: Tectonic Construction Company <br /> Bailey Pit, M. L.R. Permit No. M-84-099 , <br /> Annual Report for 1992 <br /> FEDERAL TAX ID# 84-0818720 <br /> Our files indicate that the anniversary date for this <br /> permit is September 29'h. Operations continued as approved. A <br /> Technical Revision was submitted on September 23 , 1991 to make <br /> minor changes in the mining plan. This pit HAS NOT been granted a <br /> Temporary Cessation and it HAS operated more than 180 days this <br /> year. The Financial Warranty for this operation is $73 , 000, the <br /> permitted area is 216 . 81 ac. ± and the pit is divided into 2 <br /> Reclamation Phases. A sign that conforms with rule 6.7 Signs and Markers <br /> is in place at the entrance to the pit. Please refer to the Annual <br /> Report map for the location of areas discussed in this report. <br /> We will deal specifically with each of the Annual Report <br /> questions as outlined in Section 2 . 4 . 1 of the Rules and Regula- <br /> tions. <br /> 2 . 4 . 1 <br /> (1) Mining continued in Phase 2 , south of the river, this year. <br /> An area approximately 11. 05 acres ± partially mined along the <br /> west and north sides of the south lake (brown) . We have a <br /> 21. 77 ± Plant Site (gray) north of the river and a staging <br /> area of 6 . 19 acres ± south of the river where the conveyor <br /> terminal is. This staging area is used to store pit run <br /> Tectonic Construction Co. �n <br /> 12501 Weld County Road 13 7 <br /> Longmont, Colorado 80501 <br /> (303) 444-7444/ 1-303-535-4350 `O\� <br /> An Equal Opportunity Employer <br />