Permittee Name: ectonic Construction Co. Page 2 <br /> 'Permit No: VM-84-099 46 <br /> Operation Name: Bailey Pit <br /> Anniversary Date: 09 / 29 / 93 <br /> (1 cont) <br /> materials until they are loaded on the conveyor for delivery <br /> to the plant. IN Phase 1 21.77 acres ± is Plant Site, 7 . 97 <br /> acres ± is undisturbed that will become parts of Lakes 4 and <br /> 5 (dark green) , and 5. 48 acres ± that is sod farm. We have <br /> topsoil was stockpiled in various areas around the site for <br /> use when reclamation begins (pink) . <br /> (2) No reclamation was required this year. Backfilling is <br /> continuing in the WETLAND DEVELOPMENT AREA in the north lake <br /> (aqua) . We have approximately 10. 56 acres filled in this area <br /> at this time. We have completed sloping along the river on <br /> 1 . 11 acres ± (orange) on the south lake and all of the north, <br /> west and south shores in Phase 1. The list below shows the <br /> total acres under various stages of reclamation. We have <br /> approximately 22 , 300 YD3 of soil stockpiled along the lake <br /> shore south of the river. We estimate 7, 000 YD3 will be <br /> needed for resoiling purposes. Most of the reclamation in the <br /> mined areas north of the river is complete. Only the east <br /> shore of Lake 1 is left to complete at this time. This can <br /> not be done until the plant site areas is mined because we are <br /> still working in this area. <br /> a. Backfilled: 10. 56 ac. (tan/aqua) <br /> b. Graded: 18 . 56 ac. <br /> C. Seeded: 17 . 45 ac. (green) <br /> e. Lake Surface: 38 . 38 ac. (blue) <br /> d. Topsoil Replaced: 17 . 45 ac. <br /> f. Sod farm 5. 48 ac. (light green) <br /> g. Ave. topsoil depth 12 . 00 in. <br /> (3) Mining will continue in the Lake 2 area we will be stripping <br /> ahead of mining. We will continue to mine towards the south <br /> property line on the west side of the site. We expect to mine <br /> 15. 88 acres ± this year in that area (yellow) , if additional <br /> area is needed we will start mining the area stripped (rust) . <br /> (4) Backfilling will continue in the WETLANDS DEVELOPMENT AREA. <br /> We will continue to monitor the seeded area around Lake ,#1. <br /> It appears to be successful but we will continue to monitor <br /> its growth. No other revegetation is required at this time. <br /> As in the past, we will seed an area when the seedbed prepara- <br /> tion is complete and there is no danger it will be disturbed <br /> by operations in the pit. Once we have finished mining along <br /> the river the north shore slopes will be established and <br /> graded. The soil we have stored along that side will be use <br /> to resoil the slopes. <br />