My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP32595
DRMS
>
Back File Migration
>
Report
>
REP32595
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:08:46 AM
Creation date
11/27/2007 6:17:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Report
Doc Date
5/22/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Notice of Intent to Continue Mining Operations <br />112c Construction Materials Annual Report <br />~~~ <br />DECEIVED <br />MAY 2 2 1998 <br />Permittee Name: Castle Concrete Company <br />Permit No. M-77-211 ,,,~,.~nuf~eralS~GeOlogy <br />Operation Name: Pikeview Quarry <br />Anniversary Date: May 27, 1998 <br />Total: $550.00 (Due on your Anniversary Date) <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does this mine operate MORE or LESS than 180 days per year? OR LESS <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* approx 147 <br />5. Total acres reclaimed for the report year:* 6.6 <br />6. Total number of acres in topsoil replacement stage: 21.9 <br />18" <br />a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: 30.9 <br />a. List species seeded & seeding rate for report year on back <br />1. a. Permitted acreage: 193 b. county where mine is located: E1 Paso <br />8. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* PnlvmPr for frPa plantings <br />10. Estimated total acres to be affected in the next report year:* a~n nrnx 147 <br />11. COMMENTS: P ac c addi Tonal sh is and mans fnr datailad infnrmafinn, <br />' Please show the location of the acreage for items 4 - 6 on your map**. Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />'* NOTE: If there have not been any changes since the last annual report and you <br />pre~~iously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ` Z ~ ~ l Date: 5-21-1998 <br />Please type or print current contact name, mailing address, and phone number below <br />Contact Name: Rick Paraday Phone: (719 ) 598-0215 <br />FAx No: (719 ) 59R-305'1 <br />company: Castle Concrete Company <br />Address: Box 2379 <br />Colorado SprinAS, CO 80901 <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.