Laserfiche WebLink
=_ = ~_ o <br />c v <br />C ~ ~ ~_ <br />C ~ ~ ~ <br />ENGINEERING & SURVEYING, INC. <br />June 16, 1997 <br />DNISIDO 01 W1100f0i0 A 6.i401p(vy' <br />CONSULTING CIVIL AND SANITARY ENGINEERING <br />LAND, UTILITY AND CONSTRUCTION SURVEYS <br />Harry Ranney <br />Colorado Division of Minerals & Geology <br />1313 Sherman Street -Room 215 <br />Denver, Colorado 80203 <br />RE: CARBON JUNCTION MINE; NO. C-92-080; SECOND QUARTER REPORT <br />Dear Mr. Ranney: <br />During the previous quarter (through June 15, 1997) the activity involved on site <br />has consisted of a small additional placement of materials on the fill pile plus some <br />movement of material as a test for the owner's big excavator. No spreading or <br />compaction was done on these areas. Compaction results aze included for other azeas of <br />the fill pile. This constitutes my report for the period mentioned. <br />Ve t <br />Harry <br />cc: Jim Hendricks <br />Mike Savage <br />RECEIVED <br />iiiiiiiiiiiiiiiiiii <br />999 <br />555 5. CAMINO DEL RIO <br />BODO OFFICE CENTER • UNIT A-I <br />POST OFFICE BOX 97 <br />DURANGO. COLORADO 81302 <br />TELEPHONE 970247 1705 <br />FAX 970-247-1710 <br />JUN 18 1997 <br />a <br />e~ci~ <br />