Laserfiche WebLink
~ ~ttmhPr~ ttn~ ~~suritt~Ps <br />CONSULTING CEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER D97062MT DATE 6/16/97, Monday <br />PROJECT NAME Oak Ridge Energy <br />PROJECT LOCATION Durango, CO <br />CLIENT Goff Engineering <br />CONTRACTOR same as above <br />TECHNICIAN N. West <br />WEATHER CONDITIONS <br />Cloudy, light rain <br />WORK REQUESTED <br />Field Density Test <br />FOREMAN Harry Goff <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I left for the Oak Ridge Energy project site at 2:30 p.m. I observed the project <br />site and noted that no new Ewing Mesa Crusher Reject material had been placed on <br />the project site. I then met with Mr. John Griffin, Durango Construction. He informed <br />me that no material had been placed on the Oak Ridge Energy project site since last <br />year. Durango Construction is using the material for construction of roads within their <br />Ewing Mesa Pit complex and have been selling the material. I returned to the project <br />site and performed five (51 nuclear field density tests. I left the project site and <br />returned to the office at 3:03 p.m. <br />P.O. BOK 3986 P.O. BO% 0045 214 Bodo Dive <br />CRAND 3UNCTION, CO MONTROSE, CO. 81402 DURANGO, CO. 81701 <br />(9'10) 245-4605 (970) 249-2154 (970) 259-5095 <br />