My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP30675
DRMS
>
Back File Migration
>
Report
>
REP30675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:01:10 AM
Creation date
11/27/2007 5:41:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
12/11/2003
Doc Name
Nov.03 Monthly Report
From
Battle Mountain Resources Inc
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br />December 8, 2003 <br />Mr. Jim Dillie / <br />State o•GC 1 d <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />~~~.~~~~9~® <br />DEC 1 1 1003 ~ <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />November 2003 M/onthly Report <br />Deaz Mr. Dillie: <br />Division Of A7inerals and Ge010gy <br />The following summarizes monitoring and site activities at the Battle Mountain <br />Resources Inc. (BMRI), San Luis Project for the month of November 2003. <br />Surface and ground water monitoring and analysis were completed for all required sites <br />during the month per the terms and conditions of the TR-32 Quality Assurance and <br />Quality Control (QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on November 26a', no water was present <br />for sampling and subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezo- <br />meters, the West Pit and the tailing embankment monitoring wells on November 26s'. <br />The November 26ei tailing impoundment piezometer measurements identified these <br />installations were either dry or contained less than 12 inches of water as illustrated in <br />Table 2. Tables 1 and 2 below identify the depth to water measurements collected for <br />each of the site monitoring wells, piezometers and lysimeters as required by the terms <br />and conditions of the TR-32 QA/QC plan. <br />The tailing impoundment collection pond underdrain flow was pumped intermittently <br />during the month to minimize the collection pond level. The leak detection system was <br />measured on November 30~'. The November collection pond underdrain flow average <br />was 40.94 gpm and a total of 430 gallons of water was excavated from the leak detection <br />system yielding a monthly average of 13.43 gpad. <br />P.O. Box 310 • San Luis, Colorado 81152-0310 (719) 379-0798 Fax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.