Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />November 2003 Monthly Report <br />Page 2 <br />During November, the West Pit water treatment plant operated efficiently discharging a <br />total of 8,595,400 gallons (26.38 acre-feet) of water to Rito Seco Creek, a total of <br />886,000 gallons (2.72 acre-feet) of water was transferred from the water treatment plant <br />to the tailing impoundment, and seepage along Rito Seco Creek remained dry. The <br />monthly precipitation accumulation for November was a trace, no precipitation <br />accumulation was recorded during the month although approximately 4 inches of <br />snowfall fell on November 18`s. <br />Table 1-November 2003 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitoring Site Date Depth to Water (feet) <br />M-4R 10/26/03 44.71 <br />M-6 10/26/03 Dry <br />M-7 10/26/03 Dry <br />M-8 10/26/03 Dry <br />M-9 10/26/03 141.58 <br />M-10 10/26/03 25.86 <br />M-11 R 10/26/03 43.40 <br />M-12 10!26/03 179.38 <br />M-13R 10/26/03 131.29 <br />M-14 10/26/03 140.17 <br />M-15 10!26/03 82.72 <br />M-16 10/26/03 23.60 <br />M-19 10/26/03 24.92 <br />M-21 10/26/03 19.05 <br />M-22 10/26/03 17.20 <br />M-26 10/26103 17.15 <br />M-32 10/26/03 43.19 <br />M-33 10/26/03 44.68 <br />M-34 10/26/03 22.98 <br />BF-4 10/26/03 24.96 <br />BF-6 10/26/03 30.84 <br />LS-1 10/26/03 Dry <br />LS-2 10/26/03 Dry <br />LS-3 10!26/03 Dry <br />LD-1 10/26/03 Dry <br />LD-2 10/26/03 Dry <br />LD-3 1012b/03 Dry <br />