Laserfiche WebLink
iiiiiiiiiiiiiiiiiii <br />E~~A <br />S Coal Company Seneca Coal Company <br />RECEIVED <br />July 14, 1397 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Seneca II Mine Wadge Highwall Drainage Fill <br />Dear Ms. Crosby: <br />JUL 16 1991 <br />Division of IVunerais t+~ Geoiogy <br />Attached please find a copy of the second quarter inspection <br />report for the above-referenced fill. Reclamation grading had <br />been deferred in the West Wadge Pit due to the conditions of <br />Technical Revision No. 16. The West Wadge Pit has been graded <br />for the most part with some final grade and drainage work, <br />topsoil replacement and stockpond construction to be completed <br />this year. Two areas on the highwall side and portions of the <br />drainage bottom require some maintenance repairs. This entire <br />inspection area should be completely reclaimed by the end of the <br />upcoming reclamation season. <br />if you have any questions, please call me. <br />Sincerely, <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />Attachment <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />