My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP22002
DRMS
>
Back File Migration
>
Report
>
REP22002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:55:04 PM
Creation date
11/27/2007 3:18:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Report
Doc Date
7/16/1997
Doc Name
SENECA II MINE WADGE HIGHWALL DRAINAGE FILL
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SLOPE STABILITY <br />INTERIM INSPECTION REPORT <br />AREA Wadge Hiohwall Drainage Fill DATE 06/27/97 <br />TIME 12:45 p.m. by Michael Altavilla WEATHER Sunny 70oF <br />1. Debris, organic matter coal, etc., present in fill None visible. <br />2. General gradation and characteristics of material Reclamation <br />side of pit has been regraded. Hiohwall (west side) was regraded complete for now. East <br />in August and September <br /> 1995 and looks good. Two areas on highwall side will require some maintenance repairs. <br /> Some topsoil was replaced at the very northern end of the fill area in 1995. <br />3. Presence of water, surface and ground None visible. <br /> <br />9. Condition of underdrain (approx. current width, depth, and length), material gradation <br />and characteristic, compaction, presence of water N/A <br />5. General material movement None observed. <br />6. Proximity and treatment of seep points Spoil spring 1000 ft down <br />a rate of approximately 25-35 gom (visual estimate). aradient was flowing at <br />7. Condition of slope fill surface (grading, cracks or sloughing, <br />Conditions of recently graded surface were good. Two areas on hig erosion, revegetation) <br />hwall side will require <br /> some repair. Some erosion in drainage bottom iust prior to entering topsoiled and <br /> revegetated area to the southeast. All final drainage work, topsoil replacement, and <br /> stocknond construction will be completed this year. Excellent vegetation cover around <br /> check dams. <br />8. Recommendation Continued observation of the fill area as fi <br />maintenance work is completed. Differential settlement and eros nal finish grade and <br />ion should be monitored <br /> and repaired as necessary. This area should be completely graded. retopsoiled and seeded <br /> during the reclamation season in 1997. <br />9. Accountability <br />I certify the preceding observations and comments to be true and accurate to the <br />best of my knowledge. <br />JUL 14 1997 <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.