Laserfiche WebLink
<br />J <br />~ ~~"~~g ~-~n~`~ <br />Geo-Con <br />DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-$ENTONITE SLURRY WALL <br />~~;~ CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. P05-003 <br />Date: 10!17/2006 S MQT W R F 5 Weather: Suntry Temp: 32.68 <br />1. Work Performed: Stunm ,see addition attached <br />), lI ir~~Sl~~~ <br />i APR 2 3 !U(l7 ~l/l~ <br />AREA TODAY (SF) = O.O <br />TOTAL AREA TO DATE (SF) = O.O <br />BENTONITE FOR SLURRY TODAY (BACSJFONS)= ) 9.O / 2$.S <br />RENTONITE FOR SLURRY TD DATE (RAGSri'ONS) = 19.0 / 28.5 <br />BENTONrfE FOR DRY ADDITION TODAY (BAGS/IONS) = O,O / O.O <br />BENTONITE FOR DRY ADDTI70N TO DATE (BAGSlIONS) = O.O / O.O <br />WATER USAGE AT BATCH PLANT (GAL TODAYITO DATE) O ~ / O <br />2. Results oflnspection: <br />3. Tests Required by Plans and/or Specs and Results: <br />See Attached <br />• 4. Verbal Instructions Received: <br />5. Remarks: No depdts recorded. First day of production l0/18/06 <br />Dug lead in+ started 50' fast cut <br />No record of water used at batch plain today. <br />6. Basely: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report b complete end correct and that all <br />material and equipment used, work performed and test wnducted d,ving this reportitg period were in <br />strict compliaae with the coact plans and specification except as rated. <br />Geo-Con ; <br />Inspector! Engineer! Owner <br />R~EiVED <br />Page t of t $EP 13 2007 <br />DlvMinittg and 3efety <br />~~~ , <br />