Laserfiche WebLink
~~~ Geo-CDB <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. P05-003 <br />Date: 10/]8/2006 S M T~ R F S Weather: Sunay Temp: 32.68 <br />1. Work Performed: Summary, see addition attached <br />AREA TODAY (SF) = 4,930.0 <br />TOTAL AAEA TO DATE (SF) = 4,930.0 <br />SENTONITE FOR SLURRY TODAY (BAGS/i'ONS) = 1 S.O / 22.5 <br />BENTONITE FOR SLURRY TO DATE (BAGSlI'ONS) = 34.0 / S 1.O <br />BENTONITE FOR DRY ADDITION TODAY (BAC,S/fONS) = 4.0 / 6.0 <br />BENTONITE FOR DRY ADDITION TO DATE (BAGSrfONS) = 4.O / 6.O <br />WATER USAGE AT BATCH PLANT (GAL 70DAY/I'O DATE) 9S,7OO / ~ 9S,7OO <br />2. Results oflnspection: See Attached <br />3. Tests Required by Plans artd/or Specs and Results: <br />See Attached <br />Less Ulan fu0 shift; rot all tests completed <br />• 4. Verbal Instructions Received: <br />5. Remarks: <br />Dug 190' of trench <br />Continue excavation of the <br />6. Safety: No Safety Lssues. <br />CONTRACTOR CERTQ~'ICATION; I certify that the above report is complete and correct and that aU <br />material and equipment used, work performed and test conducted during this reportug period were in <br />strict compliance with the contract plan sad specification except as rated. <br />Geo-Con ; <br />Inspector/ Engineer/ Owner ; <br />1 ' <br />LJ <br />Page t of t <br />