Laserfiche WebLink
IIIIIIIIIiIllllllll RECEIVED <br />APR i ~ 1995 <br />~ Powderhorn Coal Compc~~„~~~a <br />P.O. Box 1430 • Palisale, CO 81526 • (970) 464-7951 • (970) 4 718 <br /> <br />April 17, 1995 . :~.~v <br />.~ <br />Mr. Dan Matthews R jr~~a~~~ <br />Environmental Protection Specialist v <br />Colorado Division of Minerals and Geology <br />2148 Broadway, #C-5 <br />Grand Junction, CO 81503 <br />RE: 1994 Annual Reclamation Report, File C-81-041 <br />Dear Mr. Matthews: <br />In accordance with Rule 2.04.13, the following information is being <br />submitted as our 1993 Annual Reclamation Report: <br />• (a) Permitee: Powderhorn Coal Company <br />P.O. Box 1430 <br />Palisade, CO 81526 <br />Permit No. C-81-041 <br />(b) Area Disturbed - Cameo Borrow Area No. 1 (CBA 1). This area <br />was permitted in TR-17 as a source of cover material for the <br />Cameo Refuse Disposal Areas Nos. 1 and 2 (CRDA 1 & 2). In May <br />1994 approximately 6" of topsoil was removed from the surface <br />of the area to be disturbed and placed in temporary stockpiles <br />around the site. A sump was excavated for drainage control on <br />the site for the topsoil removal, the borrow removal and <br />reclamation of the site. Borrow material was hauled from the <br />site during May - July as part of the cover for the first <br />three benches of CRDA 1 and the first two benches of CRDA 2. <br />A second period of borrowing material occurred in August and <br />September to cover the third and part of the fourth bench on <br />CRDA 2. Approximately 33,800 cy of material was removed from <br />the site and 2.7 acres were disturbed. Borrow material was <br />depleted from this area and the topsoil redistributed. <br />Cameo Borrow Area No. 2 (CBA 2). This area was permitted in <br />TR-17 as a source of cover material for CRDA 1 & 2. In June <br />1994 approximately 6" of topsoil was removed from the surface <br />of the area to be disturbed and placed in temporary stockpiles <br />around the site. Excavation of Pond 11 for drainage control <br />• on the site was started in June and finished in July. This <br />pond will cover drainage control for disturbance and <br />