Laserfiche WebLink
lY' • III III III III IIII III • <br />flag Resources. Inc. <br />dba flag Sand ~ Gravel <br />1412 Gounty,Road 311 <br />7Vem Castle, GO 81647 <br />970-876-2397 <br />fax 970-876-SZ3Z <br />Fred and Janet fret ~=vEl\~~D <br />DEC 0 4 1997 <br />November 24,1997 <br />Mrs. Barbara Chiappone <br />Division of Minerals and Geology <br />1313 Sherman Street, Suite 215 <br />Denver, Colorado 80203-2273 <br />Dear Mrs. Chiappone: <br />Re: Silt Pit, Annual Report, <br />MLRB Permit No. M-81-202, Garfield County <br />pivis~on or MinBrdlS a QBC16gy <br />Our files indicate that the anniversary date for this permit is <br />November 27, 1997. We continued to mine in areas disturbed in past <br />years. This pit HAS NOT been granted a Temporary Cessation and it <br />HAS operated more than 180 days this year. The Financial Warranty <br />for this operation is $79,800, the permitted area is 170.70 ac. ± and <br />the pit is divided into 5 Reclamation Phases. As required in Rule <br />3.1.12 a sign has been installed at the entrance to the pit and the <br />boundary has been outlined to delineate the affected lands. A check <br />for $550.00 to cover the Annual Fee was mailed under separate cover. <br />Please refer to the 1996-97 Annual Report Map, for locations of <br />the areas discussed in this text (attached). We will deal specifi- <br />cally with the Annual Report requirements outlined in Rule 1.15 and <br />the annual report form. <br />(1) Mining continued in the Stage 1 on area disturbed in previous <br />years. Mining to total depth was completed on a 1.20 acres ± <br />parcel on the east part of the stage (///). A additional 9.96 <br />acres parcel was partially mined on the south side of the lake <br />(\1\). We have 18.05 acres ± of lake area (blue), and 21.18 <br />acres ± stripped, ready for mining (yellow). The topsoil <br />stockpile (pink) contains approximately 43,030 YD' and covers <br />1.06 acres ±. The pit is dewatered at this time, so the floor <br />of the lake area can be mined. We have reduced existing slopes <br />so they are currently being mined at a rate of 3 h to lv (pur- <br />ple). Stage 5 is still used as processing plant site and <br />contains gravel stockpiles, concrete casting beds, an asphalt <br />plant and the office facilities. We are planning to move the <br />location of the concrete plant and asphalt plants this year to <br />an area closer to the county road. A Technical Revision will <br />be submitted to address this change before it is done. <br />