My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP05921
DRMS
>
Back File Migration
>
Report
>
REP05921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:36:37 PM
Creation date
11/26/2007 11:12:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Report
Doc Date
5/25/1995
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- <br />Permittee Name: <br />Permit No: <br />Operation Name: <br />Anniversary Date <br />Total: <br />• • III IIIIIIIIIIIIIIII <br />999 <br />~LIiCI V Cl_J <br />Notice of Intent to Continue Mining Operations MAY 2 5 <br />112 Annual Report 1.995 <br />Castle Concrete Company OivisionotMinerals~,Geoiog~~ <br />M-77-210 1?~..e.~.~a7~~7p <br />Snyder Quarry <br />05/27/95 <br />$550.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: 121.29 b. County where mine is located: R_t Pasn <br />2. Has this mine been granted TEMPORARY CESSATION STATUS?. YES NO <br />Does this mine operate MORE or LESS than 180 days per year? MORE LESS / <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* 30-35 <br />5. Total acres reclaimed for the report year:* 0 <br />6. Total acres in various stages of reclamation:* <br />a. Backfilled: 6 d. Topsoil replaced: 9.5 <br />b. Graded: 11.5 Average topsoil thickness <br />c. Seeded: 11.5 replaced: 6" - 8" <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* none <br />8. Estimated total acres to be affected in the next report year:* 30-35 <br />9. COMMENTS: See additional sheet <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, you must state this fact above. <br />Signature: ~iI~C'fZ ~Gi22Z Date: 5-25-'95 <br />Please type or print current contact name, mailing address, and phone number ~ ow: <br />Contact Name: Rick Paraday /. Phone: (719 > 598-0215 <br />Company: Castle Concrete Company <br />Address: Box 2379 <br />Colorado Springs, CO 80901 <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.