Laserfiche WebLink
~II 1~~1}{!II~`III~` Doc Date:12/11/2001~ <br />I 1 9 1 1 INSPECTION REPORT - SEDIlI7ENT PONDS c X rf i 6 /-7-' <br />DISCHARGE POINT 001 - STREETER FTI.L SEDIIvfENT POND <br />Date of Inspection: // //' 9~ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />DISCHARGE POINT 002 -WORK AREA POND <br />Date of Inspection: // // ~ 9~ ~ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? _ ~r <br />If no, explain: <br />DISCHARGE POINT 003 - GOSSARD LOADOUT POND <br />Date of Inspection: ////-9.~ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, explain: <br />DISCHARGE POINT 004 - GULCH A POND <br />Date of Inspection: // // 91 , <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />DISCHARGE POINT QOS -STOKER COAL LOADOUT POND <br />Date of Inspection: //~ // • 9~ _ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? ~_ <br />If no, explain: <br />DISCHARGE POINT 006 - GOSSARD LOADOUT LOOP POND <br />Date of Inspection: //• // • 9.~ <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />DISCHARGE POINT 007 -PROSPECT POND <br />Date of Inspection: // // ~ 92 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? <br />If no, explain: <br />TAYLOR PUMP HOLDING POND <br />Date of Inspection: ~/// 91 <br />Are all embankments, spillways and dewatering devices in order as per the certified design? fs <br />If no, explain: <br />Signed: _ <br />Under the <br />~,/ /~~~ Date , <br />of Robert G. Trembly, Ir., P.E. No. 16957 <br />