My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE127780
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE127780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:54 PM
Creation date
11/25/2007 5:15:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000089
IBM Index Class Name
Permit File
Doc Date
9/11/2000
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• ~II ~I~~II~I~~~~~ ~II <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date 11-Sep-2000 Permit or job no.: M-2000-089 <br />User : ESC Abbreviation : none <br />Filename : M089-000 <br />Agency or organization name :Division Of Minerals & Geology <br />Permit or job action :New Permif Application <br />Site :Perdue Quarry <br />State :Colorado <br />County :Boulder <br />TASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION <br />FORM FLEETi TASK DIRECT <br />' USED I SIZE HOURS ~ COST <br />001 ;-Backbll slope to 3h.~ly ~ dozer ~ 1 ~ 45.89 $6,348 <br />00 R2OO eplace Topsoil dozer 7 1.611 $223 <br />003 -Revegetafion ofANecfed Land I revege ~ 1 20.OOi $3,362 <br />004 '~ MobilizafiorVDemobilization mobilizeT ~ 3.20, $791 <br />i <br />~ ' i <br />~~ -~-- <br />_ ~_ <br />~.- ~ -- <br />-~ <br />I - ~_ <br />~ i <br />i <br />I ~ i - - ' <br />- ~ <br />F i -~~ <br />~ - - - <br />i I <br />--___ <br />-~- <br />_ ~_. <br />-T -rtA-- -~- - - <br />I I <br />SUBTOTALS; 70.70 $10,724 <br />' mclutles inBaticn !actor adjustment of : NA % TOTAL DIRECT COST' _~ 510, 724 <br />OVERHEAD AND PROFIT - Liability inSUranCe : 1.55 % Of dlreCt total = $166 <br />Performance bond : 1.05 % o/direct total = $113 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct J total = $1,072 <br />'not requiretl (or eqp operator serves as super.) TOTAL 0 8 P = $1, 351 <br />PROJECT MANAGEMENT - <br />Engineeringwork and/or contracUbid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />CONTRACT AMOUNT (tlrtect+08 P)= $12,075 <br />NA NA NA total = <br />5.00 % of cntr. NA total = <br />NA' NA total = <br />NA <br />$604 <br />NA <br />'contingencies accounted for of task level TOTAL INDIRECT COST= 57,955 <br />TOTAL BOND AMOUNT (direct+ indirect) _ $12,679 <br />
The URL can be used to link to this page
Your browser does not support the video tag.