Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Agency or organization name .Division Ol Mmerels & Geology <br />TaskA. 001 State'Colorado PermiUjobrl:M-4000.089 <br />i Dale. 09/7 18 000 County ~Boultler Abbreviation :none <br />' User: ESC _ <br />Site:PeNUe Quarry Filename. M089-007 <br />Permit or other lob action 'New Permit Applicaflon <br /> <br />Task description : Back(ll Slope to 3h: iv <br /> <br />HOURLY EQUIPMENT COST Basic machine .Car D9N (7995) Horsepower ~. 370 <br /> Blade type : Semr-Universal <br /> Attachment no. 1 . ROPS Cab Shifl basis : I per tlay <br /> AttaUment no. 2 ' NA <br /> UUhzalion % Cosl data source: (CRG) <br />Cost Breaktlown : Ownership cosUhour ~ ,$74.21 NA <br />'~ Operating cosUhour: $8100 100 <br /> Ripper op. cosUhour'. $000 NA <br /> Operator cosUhour: $2372 NA <br /> Total unit nA5Uh0ur: $13834 Total fleet cesgh0ur: 5118.74 <br />~ MATERIAL QUANTITIES <br />Initial Swell Loose <br />' volume' 27.000 LCY factor. NA volume: 47,000 LCY <br />Source of quantity take-ofl :Operator Eshmafe- 1 acre <br />Source of est. swell factor ~ NA <br />HOURLY PRODUCTION <br />Averege push distance ~ 50 feet <br />Unadlustetl hourly production : 7696 LCY/hr <br />Matenal wnsistency description . <br />Conso/itlafetl stockpile <br />Averege push gradient : 0.00 % (post <br />Average site altitude . 6.360 feel <br />Material weight : 3, 300 Ibs/LCY <br />Material weight des~iption <br />Decomposetl rock - 75 % Rock, 25 % Earth <br />JOB TIME AND COST <br />Fleet sze: ~ Dozegs) <br />Unit cost: 50.235 /LCY <br />Job Condition Correction Factors <br /> Saurce <br />Operator skill ~ 0 75 j (avg.) <br />Matenal consistency : 7.00 T (Cal HB) <br />Dozing method : 1 00 (gen.) <br />Visibihry . t 00 ~- /avg.) <br />Job eRgency O. B3 (1shilf/tlay) <br />Spoil pile : 0 BO (/nd-A/ <br />Push g2dient' / 00 i (Cat HB) <br />Altitude. 1.00 (Cat HB) <br />Matenal weighU 070 -(Cal HB1 <br />-- <br />Blade ryce : / 00 ~ (S or U/ <br />Net comectian : 0.35 <br />Adjusted unit production ~ 588.36 LCY/hr <br />Adjusted fleet production : 588.36 -~ <br />LCY/hr <br />Total joD time : 45.89 Hours <br />Total job cost . 56,348 <br />