My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE127072
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE127072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:12 PM
Creation date
11/25/2007 4:15:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003068
IBM Index Class Name
Permit File
Doc Date
10/21/2003
Doc Name
Cost Summary Form
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~Ry(;L~C' / ~'P+t6 ~ G2e~lc usdtc-t<e~ <br />tia.u~c!.9/~ce 7aust' <br />CIRCES Coct Estimating Software <br />PROJECT IDENTIFICATION / <br />Date : 21-Oct-2003 Permit orjob no.: M-2003-088 <br />User : JDl Abbreviation : none <br />Filename : M068-000 <br />Agency or organization name :DMG <br />Permit or job action :final reclamation <br />Site : Mary'S Mountain Gravel Pit <br />State :Colorado <br />County : Huerfano <br />ASK LIST (DIRECT COSTS( FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Grade highwalls to 3:1 dozer 1 21.31 $2,445 <br />002 -Rip pit Boor ripper 1 14.31 $1,805 <br />003 -replace topsoil scraped 1 37.9 $5,384 <br />004 -reseed disturbed areas revege 1 35.0 $6, 790 <br />005 -mob/demob equipment mobilize 2 7.2 $2,158 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />sueroTALS: 115.7 $18,582 <br />• inclutles inflation factor adjustment of : NA % TOTAL DIRECT COST' _ $17,343 <br />DIRECT COSTS ::: ... - ... ._ ., .. .... ....... .. ... <br />OVERHEAD AND PROFIT- Liability inSUranCe : 1.55 % ofdirect total = $269 <br />Performance bond : 1.05 % of direct total = $182 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $1, 734 <br />'not required (or eqp. operator serves as super.) TOTAL O & P = $2,185 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+08P)= $19,526 <br />Financial warranty processing (legal/related costs) : total = <br />Engineering work and/or contract/bid preparation : 4.25 % of Intr. NA total = $830 <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $976 <br />CONTINGENCY- NA' NA total = NA <br />'contingencies accounted (or at task level TOTAL INDIRECT COST= $3,992 <br />TOTAL BOND AMOUNT (direct + indirect) _ $21,335 <br />
The URL can be used to link to this page
Your browser does not support the video tag.