My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE127072
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE127072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:12 PM
Creation date
11/25/2007 4:15:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003068
IBM Index Class Name
Permit File
Doc Date
10/21/2003
Doc Name
Cost Summary Form
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 10/21/2003 <br />User: JD1 <br />State :Colorado Permit/job# : M-2003-068 <br />County :Huerfano Abbreviation :none <br />Site : Mary'S Mountain Gravel Pit Filename : M068-001 <br />Agency or organization name : DMG <br />Permit or other job action :final reclamation <br />Task description :Cut and fill h <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R Series 11 - 7SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Horsepower: 240 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $35.00 NA <br /> Operating wsUhour : $47.87 100 <br /> Ripper op. cosUhour : $0.00 NA <br /> Operator cosUhour : $31.83 NA <br /> Total unit cosUhour : $114.71 Total Fleet cosUhour: $114,71 <br />.: <br />:: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 10,370 CCY factor: 1.125 volume: 11,666 LCY <br /> <br />Source of estimated volume :calculation <br />Source of estimated swell factor :program <br /><. <br />;. <br />HOURLY PRODUCTION <br /> <br />Job Condition Correction Factors , <br />>: _.: <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 854.1 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-r~ <br /> Push gradient : 1.33 (Cat HB) <br />Average push gradient : 15.00 % (neg) Altitude : 0.93 (Cat HB) <br />Average site altitude : 8,030 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.64 <br />Weight description <br />Decomposed rock - 25% Rock. 75% Earth <br />Adjusted unit production : 547.36 LCY/hr <br />Adjusted fleet production : 547.36 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 21.31 Hours <br />Unit cost : $0.210 /LCY Total job cost : $2,445 <br />
The URL can be used to link to this page
Your browser does not support the video tag.