Laserfiche WebLink
<br />January 15. 1981 <br />ftc. Vernon Dilley <br />Dilley's Sand d Grovel <br />P. 0. Bos 125 <br />Brush. Colorado 80723 <br />B8: Adequacy review of the Ayare Pit application <br />Our File: 081-4 <br />Dear llr. Dilley: <br />% have raviewod Cho above cited application and have found that a few items <br />need clarification to be considered adequate is forms of meeting the require- <br />neate of the law and the concerns of the Division. Please address the following <br />items in dotail as soon as possible as I will need time to review your response <br />before the January 28-29, 1981 Planed Land Reclamation Board meeting. <br />~IBIT B - Piinlna Plaa <br />1. Amore detailed description of the mining plan is needed. Specifically, <br />will you be leveling the sainting hi117 If a pit ie form`d, how deep <br />will it be? <br />2. Bee this site been previously mined? <br />3. hill say stockpiles be located on the site? If eo, where? <br />4. hill this be a year-zouad operation? <br />5. Hhat ie the espaetad. life-apse of this operation? <br />6. Hill any topsoil be salvaged from the eite7 <br />7. Are there nay ponds on the site? <br />L~IBIT D <br />1. How many inches of topsoil cover are presently found on the eite7 <br />3. Hhat are the species of treos. mentioned is 8lchibit g. that are presently <br />growing on the site? <br />3. Hill Chia operation affect surface water drainage and/or groundwater <br />within the permit bo~undary4 <br />EB1iIBIT B - Beclamation Plan <br />1. How many inches of t:opeoil cover will be redistributed over the affected <br />I a,.d,7 <br />