Laserfiche WebLink
<br />Par. Vernon Dilley <br />January 15, 1981 <br />Page Two <br />2. Do you plan on reclaiming the previously mined areas? The access roadY <br />9. tdill any standing mater remain oa the Bite during and after reclamationY <br />If not, how will the reclaimed land be used 4os fishing4 <br />4. If ponds will be formed as pare of reclamation, ve need to know the vise <br />and dimensions of these ponds. <br />S. The following seed mis should be incorporated lato the adopted Soil <br />Conservation 6arvice reclamation pleas <br />Species <br />Sideoaeo grams <br />Little bltteetem <br />Sand dropsaed <br />Slue grams <br />Yellow s~reetclovar <br />No -Busssan olive <br />Cara$ai18 <br />asmac (Quailbrush) <br />No -Iioneylocuat <br />drill rates (double if broadcast seeded) <br />3 lbs. PLS/acre (PLS ~ Pura Live Seed) <br />3 lbs. PLS/acre <br />1 lb. PLS/acre <br />1 lb. PLS/acre <br />1 lb. PLS/acre <br />seedlings planted in random patterns <br />S in a bsmeh 5 feet apart <br />5 in a bunch S feet apart <br />S in a bunch 5 feet apart <br />Suppleaental woad control may be necessary and, if possible, 2 to 3 wateringe <br />per summer should be done for the trees and shrubs. Planting should be done <br />as soon ao the ground le workable in early springs. Pluleh applied at the <br />base of tho seedlings will incroasa thoir chance of survival. <br />6, tdhan do you esspect to begin reclamation? <br />E7~ISIT ti - Reclamation Cost <br />fl. i1e need the total reclamation cost that you propose to pout as surety. <br />Thio moat includo tb.e cost of grading and retopsoiling. <br />If you cannoe adequately address the above itersa in time for the January Soard <br />meeting, you may matte a written requcat for a continuance prior to the January <br />IIoard meeting. I will 6e Inspecting this site in the nearrfuture and if any <br />queeeions arise from this inspection i will let you to~ow. <br />9lnceroly, <br />Jay Lucas <br />Reclamation Specialist <br />JL/gym <br />