Laserfiche WebLink
Doc Date:12/11/2001 <br />iii iiiiiiiiiiiiiiii <br />RULE 2 PERMITS sss <br />• 2.01 PERMITS - GENERAL REQUIREMENTS ~~ S/~ <br />2.01.1 Scope <br />The scope of this section establishes the minimum general require- <br />ments for permits required to continue surface coal mining and <br />reclamation operations under the Colorado regulatory framework. <br />The objective of this Section is to insure that all operations make <br />timely application for permits, and that all surface coal mining <br />and reclamation operations are conducted only under permits issued <br />in accordance with the requirements of the Colorado Surface Coal <br />Mining Reclamation Act and regulations promulgated thereunder. <br />2.01.2 General Requirements for Existing Operations <br />The information contained within this application is designed to <br />effect compliance with the regulations of the approved Colorado <br />program. Therefore, the format of this application has been <br />_ developed to follow the requirements of the Colorado regulatory <br />program. <br />As required, Colowyo filed its initial application on February 5, <br />1981 with the Colorado Mined Land Reclamation Division to meet the <br />regulatory requirement of not later than two months following the <br />date of approval (December 15, 1980) of the Colorado regulatory <br />program by the United States Secretary of Interior to comply with <br />the additional applicable provisions of Rules 2 and 4. <br />2.01.3 General Requirements for Permits for All Surface Coal <br />Mining Operations <br />Colowyo has prepared this application in compliance with the <br />applicable requirements of Rules 2 and 4 of the approved Colorado <br />program. <br />2.01-1 <br />