Laserfiche WebLink
EXHIBIT 69 <br />Sylvester Gulch Facilities Area <br />Contents <br />Section A: Sylvester Gulch Facilities Area Description <br />I. Initial Project Description & Drawings Ventilation Shafts #1, #2, and #3, Substation, <br />Degasification and Electric Borehole, Roads, and Associated Facilities <br />General -Figure Nos. E611101 A - E6111109A <br />Shaft Site -Figure Nos. E611201 A - E611202A <br />Drainage & Erosion Controls -Figure Nos. E611301A - E611311 A <br />Slope Stabilization -Figure Nos. E611401A - E611410A <br />II. Mine Dewatering & Treatment Facilities <br />Figwe 1 -Facilities Plan <br />Figure 2 -Process Flow Diagram <br />Section B: Reclamation Quantities and Diaerams <br />Table I -Earthwork Quantities for Sylvester Gulch Site Development <br />Table 2 -Sylvester Gulch Shafts -Material Quantities for Permanent Shaft Facilities & <br />Construction <br />Table 3 -Sylvester Gulch Facilities -Quantities of Materials for Reclamation <br />Table 4 -Reclamation Quantities for Shaft #3 <br />Figure 1 -Typical Shaft Seal <br />Figure 2 -Typical Shaft Seal -Ventilation Shaft #3 <br />Section C: Slope Stability Improvements <br />I. Construction Approach & Construction Monitoring Program for Potentially Unstable Slopes <br />II. Failed Fill NOV CV-97-009 Abatement <br />Figure 1 -Plan <br />Figure 2 -Cross-Section of Trench Drain <br />III. Sylvester Gulch Substation and Landing #2 Road <br />Discussion <br />Figure 1 -Key Plan <br />Figure 2 -Landing #2 Road -Retaining Wall Structwe Section, Details, and Specifications <br />Figure 3 -Proposed Site Modifications Plan -Substation <br />Figure 4 -Gravel Drain -Typical Cross-Section <br />