Laserfiche WebLink
Contents Continued <br />• Section D: Geotechnical Drilling Programs <br />I. Summer 1996 Soils Investigation (MR184) <br />Scope of Work <br />Figure 1 -Location Map <br />Table A - Abandonment/Completion Reports <br />II. 1997 Drilling Program (MR210 and MR218) <br />Scope of Work (MR210) <br />Figure 1 -Location Map <br />Scope of Work (MR218) <br />Table 1 -Summary of Geotechnical Drilling Program <br />Table 2 -Geotechnical Drilling Earthwork <br />Figure 1 - 1997 Geotechnical Drilling Program <br />Status Ugdate Letter -November 7, 1997 <br />Table B - Abandonment/Completion Reports for 1997 Drilling Programs <br />III. 1998 Geotechnical Drilling Program (MR244/245, MR246, MR247) <br />Scope of Work (MR244/245) <br />Table 1 - 1998 Geotechnical Program <br />Figure 1 - 1998 Geotechnical Investigation <br />Scope of Work (MR246) <br />Figure 1 -Proposed Sylvester Gulch Coreholes <br />Figure 2 -Proposed Sylvester Gulch Boreholes <br />Scope of Work (MR247) <br />Table 1 - 1998 Geotechnical Drilling Program, Sylvester Gulch (Wetland Holes) <br />Army Corps of Engineers Letter (July 29, 1998) <br />Figure 1 - 1998 Geotechnical Investigations - MR247 Proposed Wetland Drilling Sites <br />Table C - AbandonmentlCompletion Reports for 1998 Drilling Programs <br />Section E: Miscellaneous Drawings <br />Figure 1 -Stream Buffer Zone <br />Figure 2 -Environmental Improvements for Sylvester Gulch Facilities <br />Invert Plan and Profile for CSLY-18 (multiplate culvert) <br />Figure 3 -Environmental Improvements for Sylvester Gulch Facilities <br />Inlet and Outlet Plan and Sections for CSLY-18 (multiplate culvert) <br />