My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE113152
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE113152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:09:21 PM
Creation date
11/24/2007 10:17:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X199016823
IBM Index Class Name
Permit File
Doc Date
12/3/1990
Doc Name
FINAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iiiiiiiiiiiiiiiiiii <br />999 <br />~~04~ ~Oq DEPARTMENT OF NATURAL RESOURCES <br />/t, ~~y 9Qi D Monte Pascoe Execmne Gircctor <br />;.~ ~ .,°~ MINED LAND RECLAMATION DIVISION <br />*~b~ ~ DAVID C.SNEl10N, Dirrretor <br />X876' <br />Aionaro D. Lamm _J <br />Gocemor r/_~ <br />--1 <br />COAL EXPLORATION FINAL RECLAMATION REPORT <br />PROSPECTOR: Peabody Coal Company <br />ADDRESS: 1300 S. Yale <br />Flagstaff, AZ 86001 <br />NOTICE OF INTENT NO.: CX-90-168-23 <br /> <br />PROJECT NAME: Seneca II-W/Yoast Monitor Wells <br />COUNTY- Routt <br />DATE: Nov. 16, 1990 <br />This report is filed in accordance with Rule 2.02.6(3)(b) of the Regulations <br />of the Colorado Mined Land Reclamation Board for Coal Mining adopted in <br />accordance with the Colorado Surface Coal Mining Act, C.R.S. 34-33-101 et seq. <br />The report is to be submitted to the Division within 30 days after the end of <br />the period of exploration specified in the approved Notice of Intent, as <br />amended. <br />Attach a map showing: <br />a) The final locations of all notes drilled during this project, <br />b) The locations of all roads modified or constructed for the <br />project, and <br />c) All areas significantly disturbed by the operator. <br />2. Have all disturbed areas, including drill holes, been reclaimed in <br />accordance with the approved plan and the above-referenced regulations? Yes <br />3. Were any newly constructed project roads retained for the landowner? <br />"Sec #7!f yes, a) attach a letter from the landowner that grants consent, <br />bTndicate the road location on a map, and c) describe the approximate <br />specifications of the road (width, .length, surface material used). <br />4. Did any drill holes experience surface artesian flow conditions? No <br />If yes, locate these holes on a map and describe sealing and plugging <br />procedures that were used. <br />5. Were any drill holes converted to a water well? des If yes, list <br />the State Engineer's Well Permit Number and name and address of the user. <br />All wells will be used for water monitoring activities by Peabody Coal <br />Comoanv. Please see Attachment A for State Engineer's Well Permit Numbers. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.