My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109180
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:48 PM
Creation date
11/24/2007 5:56:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979131
IBM Index Class Name
Permit File
Doc Date
1/11/2002
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />999 <br />PROJECT IDENTIFlCATION <br />Date : 11-Jan-2002 Permit or job no.: M-1979-131 Site : Korinek Sand And Gravel Pit <br />User : ALA Abbreviation : none State : Colorado <br /> Filename : M131-000 County : Crowley <br />Agency or organization name : DMG <br />Permit or job action ;Reclamation Bond Calculation <br />TASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Grade Highwall NA 1 5.0 $928 <br />002 -Ripping Pit Floor NA 1 4.00 $773 <br />003 -Replace Topsoil NA 1 3.0 $251 <br />004 -Demolition of Crusher and Washer NA 1 6.0 $700 <br />005 -Revegetation NA 1 10.0 $1,224 <br />006 -Mobilize Demobilize NA 1 5.5 $957 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />suerorALS: 36.5 $4,833 <br />' includes inflation lactor atljuslment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />TOTAL DIRECT COST' ~ $4,833 <br />1.55 % 01 direct total = $100 <br />1.05 % o/ direct total = $68 <br />NA' NA NA total = NA <br />10.00 % of direct total = $647 <br />'not required (or eqp. operator serves as super.) TOTAL O 8 P = $815 <br /> CONTRACT AMOUNT (tlirect + O 8 P) _ $5,648 <br />PROJECT MANAGEMENT <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % o(cntr. NA total = $364 <br />coNrINGENCV - NA' NA total = NA <br />contingencies accounted for al task level TOTAL INDIRECT COST= $1,179 <br />TOTAL BOND AMOUNT (direct + indirect) = 56,012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.