My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109180
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:48 PM
Creation date
11/24/2007 5:56:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979131
IBM Index Class Name
Permit File
Doc Date
1/11/2002
Doc Name
COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 001 <br />Date : 01/10/2002 <br />User: ALA <br />State :Colorado PermiVjob# : M-1979-131 <br />County :Crowley Abbreviation :none <br />Site :KorinekSandAndGravelPit Filename :M131-001 <br />Agency or organization name : DMG <br />Permit or other job action :Reclamation Bond Calculation <br />Task description :Grade Highwal! <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9U <br />Blade type : Universal <br />Attachment no. 1 ; ROPS Cab <br />Attachment no. 2 : 1-shank ripDe <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $55.12 NA <br /> Operating cosVhour : $96.43 100 <br /> Ripper op.cosUhour : $4.73 40 <br /> Operator cosVhour : $27.99 NA <br /> Total unit cosUhour : $184.28 Total fleet cosUhour : $184.28 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 10,000 LCY factor : NA volume : 10,000 LCY <br /> <br />Source of estimated volume :Personal Estimate <br />Source of estimated swell factor:NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 1.00 (excl.) <br />Average push distance : 75 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 1,600.0 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 f 1shilUday) <br />Partly consolidated stockpile Spoil pile : 1.00 (doz•oc) <br /> Push gradient : 7.60 (Cat HB) <br />Average push gradient : 30.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,300 feet Material weigh[ : 0.71 (Ca! HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,250 Ibs/LCY Net correction : 1.24 <br />Weight description <br />Gravel - Pitrun Adjusted unit production : 1985.78 LCY/hr <br /> Adjusted fleet production : 1,985.78 LCY/hr <br /> <br />J06 71ME AND COST <br />Fleet size : 1 Dozers) Total job time : 5.04 Hours <br />Unit cost : $0.093 /LCY Total job cost : $928 <br />
The URL can be used to link to this page
Your browser does not support the video tag.