Laserfiche WebLink
<br />~; <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparimenl of Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, Colorado 80203 <br />Phonc: 13031 866 3 56 7 <br />fAX: (3031 832-81 06 <br />March 22, 1994 <br />Mr. Lee Sutherland <br />West End Gravel Company <br />29703 Highway 97 <br />P.O. Box 126 <br />Nucla, CO 81424 <br /> <br />rrr' n ~r_r ._ . <br />III IIIIIIIIIIIII III - <br />999 <br />COLORADO <br />RE: West End Gravel Pit No. 1, File No. M-94-011, Montrose County <br />Dear Mr. Sutherland: <br />In order to satisfy the requirements of the Mined Land Reclamation Act and the <br />Mineral Rules and Regulations, the below noted concerns need to be addressed: <br />1. The legal description on Exhibit "A" is incorrect. It states "thence <br />588° - 40'W to corner No. 3; thence 522°-10'E to corner number 4." I <br />believe it should read thence S88° - 40'W and thence S22°-10'E. Please <br />correct and submit a new copy of Exhibit "A". <br />U~b~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Rny R°mrr <br />Governor <br />Ken Salazar <br />E~ecmrve DireUnr <br />hlichac~ B. LunK <br />Division Dvenor <br />2. The Agreement to Remove Gravel has an incorrect legal description. Please <br />correct Exhibit "G", have it signed and notarized, and submit the corrected <br />copy. <br />3. In order to have stable topsoil stockpiles the sideslopes should be graded to 3:1 <br />(not 2:1) and seeded with the wheatgrass species you are proposing to use. <br />4. You state in Exhibit "F" that you will not need any permit other than the <br />~clamation permit for the Division of Minerals and Geology. This, of course, <br />is not true. You will need an air quality emissions permit and, possibly, a <br />stormwater management plan permit. Please correct Exhibit "F" and submit a <br />corrected copy showing what other permits are required. <br />5. You state that operations will commence with the removal of all topsoil but, <br />according to our discussion during my inspection March 17, 1994, what you <br />meant was the topsoil will be removed from the proposed phased 2 acre area. <br />Please correct Exhibit "C". <br />