Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303)832-8106 <br />May 20, 2002 ~ <br />Mr. Eric Reckentine <br />Western Mobile Southern, Inc. ~ <br />1590 W. 12th Ave. <br />Denver, CO 80204 <br />~ t ~ <br />Re: Beeman Pit #1, M-2002-009, Permit Issuance -Construction Material Operation <br />Dear Mr. Reckentine: <br />~~ <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />0.ECLAMATION <br />MINING•SAFETY <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Michael B. Long <br />Division Director <br />On May 20, 2002 the Division of Minerals and Geology found Western Mobile Southern, Inc. to have satisfied <br />the applicable requiremeuts of C.RS. 34-32.5-101 et seg. for obtaining a mining and reclamation permit. <br />Therefore, a pemut is being issued. Two signed originals of the permit have been executed. We have kept one <br />copy for our files and are enclosing one copy for your use. It is your responsibility to comply with all of the terms <br />of the pemrit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your <br />permit. They have been incorporated into the permit by reference. We presume that you have a copy of all of <br />these materials; therefore, none have been enclosed with tins mailing. We suggest that you keep a copy of the <br />permit and the permit application at the mining operation as a reference for operating personnel, to help ensure <br />compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consulting the Construction Materials Rules and Regulations <br />and/or contacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, May 20th, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit is $688.00. Please consult the Act, Rules and Regulations, and your <br />pemut for specific annual report requirements applicable to your mine. <br />If you have any questions, please the contact the Division. <br />Since <br />MICHAEL B. <br />Division Director <br />MBL/BMK/bdc <br />Enclosure <br />