Laserfiche WebLink
<br />• • iii iiiiiiiiiiiii iii <br />999 <br />~~ Cripple Creek & Victor Gold Mining Company <br />A Joini Venture - Pikea Peak Mining Company, Manager <br />(1 Q 7 Operations Office Englewood Olflce <br />/t~3~LV P.O. Box 191, 2755 State Highway 67 5251 DTC Parkway, Suite 700, Englewood <br />Victor, Colorado 80860 Colorado 80111 <br />(719) 6832977 • FAX (719) 689-3254 (303) 889-0700 • FAX (303) 889-0707 <br />November 8, 1994 <br />SENT BY FACSIMILE -HARD COPY FOLLOWS BY FEDERAL EXPRESS <br />Mr. Berhan Keffelew <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Mines and Geology <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RECEIVED <br />NOV 10 1994 <br />pivision of m~nerais & Geology <br />Reference: Cresson Project: Permit Number M-80-244: Construction of Additional <br />Summa Downgradient of Initial Sump of First Phase Tce Berm. <br />Dear Mr. Keffelew: <br />The Cripple Creek & Victor Gold Mining Company is providing a layout for the pumping sump <br />under construction to improve transfer of water from the Valley Leach Facility underdrain back <br />into Arequa Gulch. This is provided in response to your request. This sump, along with the <br />existing sump, will serve until the second phase of the Valley Leach Facility is constructed. The <br />additional sump is designed to hold the pumps and reduce air entrainment and, by allowing water <br />to increase in depth in the existing sump, will increase retention time and thereby further <br />decrease sediment loads, if any loading occurs. The additional sump, because it is constructed <br />of concrete, will be easier to enter for retrieval of pumps. <br />Per your instructions, the installers were directed to roughen the concrete surface to provide a <br />foothold for wildlife. During operations, this pond will contain only underdrain flow from the <br />perforated pipe and rock underdrain, the spring flow from Arequa Gulch, and local runoff from <br />the immediate area of the tce berm. Upon completion of the second phase, the sumps will be <br />removed and the area will become part of the Valley Leach Facility. <br />If ditional info mation is required, please let me know, <br />Si c~r ly v <br />Jo E. Hardaw y <br />anager Environmental Affairs <br />Thank you for your assistance. <br />Attachment: a/s (2 pp) <br />FILE: CC&VSTIP.002 <br />