Laserfiche WebLink
<br />f , <br />M E M O R A N D U M <br />Date: September 19, 1994 Our Ref .:943-2732 <br />T0: Bob Treistman, Bateman Engineering Inc. <br />FROM: Terry Mandziak, Golder Associates Inc./~ <br />RE: SUMP LAYOUT <br />Golder Associates Inc. (Golder) has developed a layout for the <br />second sump pond. The second sump will be located adjacent to the <br />sump at the downstream toe of the Phase 1 Toe Berm, as illustrated <br />in Attachment 1. The layout will require that some additional <br />Carlton tailings be excavated in order to meet the sizing criteria. <br />septl9a.let <br />