My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL38507
DRMS
>
Back File Migration
>
General Documents
>
GENERAL38507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:15 PM
Creation date
11/23/2007 9:42:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
General Documents
Doc Date
8/25/1980
Doc Name
NOV ISSUED JULY 31 1980
From
NORTHERN COAL CO
To
MLRD
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Suite 200. 740 So. Cobrado Blvd. <br />P.O. Bw 17583, Terminal Rnne~ <br />Denver. Cobrado 80217 <br />Telephone 303-753.8600 <br />August 25, 1980 <br />Northern <br />Coal <br />Company <br />Mr. Richard Mills <br />Reclamation Specialist <br />Mined Land Reclamation Division <br />723 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />III IIIIIIIIIIIII III <br />999 <br />Re: Notice of Violation Issued July 31, 1980 <br />Dear Mr. Mills: <br />The above mentioned Notice of Violation is scheduled <br />for informal conference on August 25, 1980 at 1:00 p.m. <br />In an effort to facilitate review of the proposed civil <br />penalty in this matter, Northern Coal Company would like <br />to submit certain information for your consideration. <br />As a preliminary matter Northern Coal Company is willing <br />to admit that a violation did in~fact occur, and.that <br />approximately .02 acres of top soil were covered by the <br />toe of a haul road which was in the process of being <br />reconstructed to class one road design criteria. The <br />violation occurred when the toe of the fill for the road <br />rolled out onto an area where top soil had not been <br />effectively removed. We should point out at this time <br />that top soil was removed from the construction area, <br />however the road base as constructed was approximately <br />five feet wider than had been anticipated. <br />Coal Company. <br />We would like to submit for your review a schedule of <br />abatement of this violation which was followed by Northern <br />Thursday, July 31st, 1960 - <br />Notice of Violation <br />issued. All work on <br />haul road is halted. <br />Denver office notified <br />of Notice of Violation. <br />All work on haul road <br />ceases in order to <br />implement abatement <br />procedures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.