Laserfiche WebLink
<br /> <br />~II II~II~II~~~~~ ~I~ <br />JAMES M. BREWER <br />COMMISSIONER DIST. NO. t <br />DR. RICHARD A. MARTINEZ <br />COMMISSIONER DIST. NO. 2 <br />KATHY PARLEY <br />COMMISSIONER DIST. NO. 3 <br />KATHY PARLEY <br />CHAIRWOMAN OF BOARD <br />DOROTHY A. HEWITT <br />BUDGET DIRECTOR <br />TERRY A. HART <br />COUNTY ATTORNEY <br />BOARD OF COUNTY COMMISSIONERS <br />DEPARTMENT OF PLANNING AND DEVELOPMENT ~ <br />'4:EMORANDUM RE~~~VED <br />TO: Pueblo County Planning Commission DEC 15 1994 <br />r ROM: Steven Meier, Senior Planne ;rye <br />DIVIS10n Of Minerals & Ge010g~/~ <br />DATE: December 12, 1994 <br />SUBJECT: SPECIAL USE PERMIT NO. 570 (2ND AMENDED), SOUTHWEST <br />READY MIX, C/O JOHN UNGEFUG, 37400 HIGHWAY 96 EAST <br />aURPOSE <br />This is a second amendment to a special use permit which allows the <br />extraction and processing of natural deposits, and a concrete batch plant in <br />an A-1, Agricultural (minimum 40 acres) Zone District. The applicant <br />requests a second amendment to the special use permit to increase the sand <br />and gravel pit area from 75 acres to 364.88 acres; and the concrete batch <br />~olant area from 54 acres to 76.31 acres (Exhibit 1 a-i). <br />LOCATION <br />The concrete batch plant is located z mile east of 36th Lane on the south <br />side of Highway 96 East. T he sand and gravel pit is located to the east and <br />southeast of the plant area. The special use permit is legally described as <br />a portion of the NE; of Section 33; and a portion of the SZ of Section 34; <br />and a portion of the SW4 of the SW4 of Section 35, Township 20 South, <br />Range 63 West; and portions of the N`,- of Section 2 and Section 3, Township <br />21 South, Range 63 West of the 6th P.M. (Exhibit 2). <br />BACKGROUND <br />The Pueblo County Planning Commission (PCPC) first approved this Special <br />Use Permit No. 570 in December 1985. On January 28, 1986, the PCPC <br />approved an amendment to this permit regarding the access, configuration of <br />the extraction area, and location of the batch plant. The PCPC approved <br />one-year reviews of the special use permit in January 1987, March 1988, and <br />on March 28, 1989. The following conditions were placed on the last <br />approval: <br />1120 COURT STREET, ROOM 200 <br />PUEBLO, CO 81003-2819 <br />(719)563-6100 <br />FAX: (719)583-6376 <br />C~ . ~...,.,_..,. <br /> <br />