Laserfiche WebLink
Mountain Coal Company <br />Wat Elk Mine <br />Poet Offbe Box 591 <br />somer..et, Cokxado Bt 434 <br />Telephone 970-929.5075 <br />May 29, 1997 <br />Mr. Mrchael Boulay <br />RFr.EivED <br />JUN 0 2 ~gg~ <br />Division of iwworaiy a t;eoloBY <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />iii iiiiiiiiniiiiii <br />999 <br />RE: Minor Revision No. 216 (Ventilation Shaft #3); West Elk Mine; <br />Permit No. C-80-007 <br />Dear Mike: <br />Mountain Coal Company (MCC) requests a minor revision to construct a third <br />ventilation shaft in Sylvester Gulch. Due to the time that will be.required to complete <br />the two large ventilation shafts (PR#07), it is necessary for MCC to construct a third, <br />smaller diameter ventilation shaft (#3) to more immediately supply air to the mine. <br />MCC anticipates beginning the construction of shaft #3 by mid-July and have it on- <br />line by early-December. <br />Also, included in the revision are details and text regarding the electric borehole site <br />(PR#07) and the degasification hole (MR#214). Shaft #3 is located approximately 1.5 <br />miles southeast of the existing Sylvester Gulch ventilation fan and approximately 400 <br />feet east of the electric borehole site. The degasification hole is located <br />approximately 225 feet west of the electric borehole site. Please find enclosed a <br />revision application form and supporting text, maps and exhibits. A Gst of the text, <br />maps, and exhibits included with this revision application is also enclosed. <br />Site development of shaft #3 will include alight-use road, which begins at the electric <br />borehole road and a 65 feet wide by 145 feet long pad. A mechanically stabilized <br />earth (MSE) embankment will be constructed on the east side of the pad. The <br />XSTABL stability analyses are included with this revision application for the <br />Division's information. A portion of the road alignment proposed in MR#214 for the <br />initial drilling of the holes will be utilized for the final road alignment. <br />The description of the electric borehole site, provided previously in Exhibit 69, <br />remains the same. Text has been added to Exhibit 69 to provide details on the <br />borehole and reclamation of the site. The alignment of the light-use road to the <br />electric borehole site, as proposed in PR#07 has been revised. It will be constructed <br />in the location as shown on revised Map 53B. <br />The completion of the degasification hole was described in MR#214. However, <br />Exhibit 69 and the permit text (Volume 1) has been updated to provide details on the <br />purpose, construction, and reclamation of the hole. <br />