Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />131 3 Sherman 51., Room 315 <br />Denver, Colorado 80203 <br />Phone: (3031 866-35ti7 <br />FAY: (3031 832-8106 <br />November 12, 1999 <br />Dls/I S ION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MI NING•SAFEiY <br />Eastside Coal Company, Inc. Bill Ovens <br />Stephen Self c°vernor <br />Greg E. Walther <br />1098 County Road 214 EaecuOVe D reel°r <br />Silt, Colorado 81652 Michael B. Long <br />Division Director <br />Sub]ect: Permit C-84-063, Minor Revision 27 and Permit Renewal Number 3, Time Extension <br />References: Your letter of November 2, 1999, Re: Permit No. C-84-063, Request for extension <br />for approval. <br />Your letter of November 11, 1999, Re: Permit Renewal #3 -Permit No C-84-063 <br />Deaz Mr. Self: <br />Your request for extension of the proposed decision date for Minor Revision 27 (MR-27) until <br />December 15'~ is approved. However, a decision on MR-27 is a prerequisite to a decision on <br />Permit Renewal Number 3 (PR-3). As such, a request for an extension on PR-3 is also required (a <br />proposed decision was scheduled for November 12, 1999). As we discussed by telephone on <br />November 10, 1999, your request is also considered as a request for an extension for PR-3 (and <br />such a request was submitted in your letter of November 11, 1999). Your request for extension of <br />the proposed decision date for Permit Renewal Number 3 until December 15` is approved. <br />The extension until December 15, 1999, for a proposed decision regazding Permit Renewal <br />Number 3, will delay a final status of a proposed decision on the renewal until February 7, 2000. <br />The current permit expires January 13, 2000. As your permit renewal application was Found <br />complete 180 days prior to the expiration date, your reclamation activities may continue beyond <br />the expiration date under the provisions of Rule 2.08.5(3)(f). <br />The information requested in the Division of Minerals and Geology (Division) letter of September <br />] 7, 1999 is required for the Division to make a decision on MR-27 (and in tum, PR-3). <br />As we discussed by telephone on November ] 0, 1999, the Division also anticipates(d), in order to <br />make a decision on PR-3: <br />Item 1: A revision to page 59, line 37, so as to change "An annual hydrology report will be <br />submitted to the Division afer completion of the calendaz yeaz." to read "An annual hydrology <br />report will be submitted to the Division, after completion of the calendar yeaz, by the end of <br />February following.", or words to that effect. The purpose was to designate a date of submittal <br />[Rule 4.05.13(4)(c)]. Inclusion of this revision incorporates the provision of Stipulation Number <br />