My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV97504
DRMS
>
Back File Migration
>
Revision
>
REV97504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:51 AM
Creation date
11/22/2007 12:10:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
Revision
Doc Date
4/6/1995
Doc Name
REVIEW OF RESPONSES TO COMMENTS TR TR-10 EASTSIDE MINE C-84-063
From
DMG
To
EASTSIDE MINE
Type & Sequence
TR10
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1: <br /> <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1313 Sherman SL, Room 215 <br />Denver, Colorado 80203 <br />Phone ~. 13031 866- 3 567 <br />FAX: 13031 832-8106 <br />April 6, 1995 <br />Mr. Steven 8. Self <br />Eastside Mine <br />P.O. Box 161 <br />Silt, CO 81652 <br />Re: Review of Responses to Comments <br />Technical Revision No. TR-10 <br />Eastside Mine (C-84-063) <br />Dear Mr. Self: <br />~~ <br />DEPAR'T'MENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames 5 Lxhhead <br />Executive Duector <br />Michael B Long <br />Division Director <br />The Division has reviewed your responses to our adequacy concerns <br />regarding the above referenced technical revision and has <br />additional comments. The numbering sequence used below follows the <br />sequence of the original adequacy review dated March 7, 1995. <br />1) The revegetation success standard was added to the <br />discussion on page 109. Therefore, this comment has been <br />adequately addressed. <br />2) A 33$ discrepancy remains between Eastside's and the <br />Division's estimates of cut and fill material available <br />on site. In an effort to resolve this discrepancy, <br />Eastside has agreed to send the pre-mining and post- <br />mining data points to the Division so that information <br />can be converted into the EarthVision program which will <br />allow the Division to accurately calculate the volume to <br />be used for regrading the site. <br />3) Eastside's estimates for the cost of shaping the proposed <br />diversion channel and for purchase and placement of <br />filter fabric and riprap material is adequate. <br />4) and 5) The Division's concerns regarding costs for <br />rock lining and filter fabric or gravel lining <br />in the diversion channel will no longer apply <br />if the channel is liked with vegetation <br />instead of riprap as verbally indicated by <br />Eastside. However, Eastside still must submit <br />designs for the vegetative lining. <br />
The URL can be used to link to this page
Your browser does not support the video tag.