Laserfiche WebLink
<br />~~ M <br />O1i66' <br />September 21,1992 <br />Mr. James Stevens <br />Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Sherman Street #215 <br />Denver,Colorado 80203 <br />M III IIIIIIIIIIIIIIII <br />VALCO, INC. <br />GUNNISON CONCRETE DIVISION <br />P.O. BOX 837 <br />GUNNISON, COLORADO 81230 <br />(303(641-'}0~9f51 <br />/~/-DOl <br />~~~~~V~ <br />C <br />SEP `~ ~ 1992 <br />MINERALS~~ EUC(;~;~ <br />Re: Amendment Request from Va1co,Inc.- Rozman Pit #M81-014 <br />Dear Mr.Stevens: <br />Please consider this letter as an official part of the attached <br />amendment application for the above referenced permit. We have <br />four f4) items to address in this amendment application. This <br />includes a response to item (2) of your inspection report. A <br />new map showing new boundries and rephasing of the mining plan <br />is enclosed. <br />Item (A) response to your item (2) <br />Valco Inc. exchanged 27.25 acres of leased land with John and <br />Marilyn Rozman for the develoment of Riverland Industrial Park <br />of Crested Butte. Of this 27.25 acres only 11.28 acres are in <br />the permitted area. All of the buildings you refer to are in <br />Riverland Industrial Park which is the 11.28 acres to be removed <br />from permit # M81-014. No mining will be done within 200 ft. <br />of these buildings. Mining in phase 1-B will be done as indicated <br />in the permit but with new boundries. Reclamation will run one <br />year behind the mining schedule. <br />Item (B) <br />From the leased land exchange,Valco Inc.,received 40 acres. We <br />want to add this to the southwest corner of this permit.The legal <br />description of this 40 acres is SW/4-NE 1/4 of section 13,T-14 <br />south,Range 86 west,6th P.M. This will be oprated the same as the <br />other permitted area.It will be a dry pit,so there will be no <br />water to deal with. Stripping will be done with a scraper or <br />front end loader. The existing topsoil will be carefully handled <br />and stockpiled around the perimeter so it will not be disturbed <br />during the mining.Within one year after being stockpiled a <br />vegetative cover will be seeded per SCS recommendations,so they <br />will not be adversely affected by the elements. Crushing and <br />processing will handled as in the original permit.Reclamation will <br />follow our original permit,with the exception of the change asked <br />for in item (C) in this amendment application. This parcel shall <br />be called phase six (6). <br />ROCKY FORD PUEBLO CANON CITY LAMAR CRESTED BUTTE <br />