Laserfiche WebLink
<br />STATE • II I III III III I'll'll <br />OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1 31 3 Sherman $1 . Room 215 <br /> <br />Denver, Colorado 80203 II~~~~~ <br />Phone. 13031 866-3567 <br />FAX. 6071 8728106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br /> Roy Romer <br /> Governor <br /> James S LochheaA <br />August 6, 1 9 9 5 Ezeculive Director <br /> Michael B. Long <br /> Division Director <br />Robert L. Siegrist <br />Colorado Sand and Gravel Company <br />6999 York Street <br />Denver, Colorado 80229 <br />RE: Sandy Acres Pit, File No. M-80-110 <br />112 Amendment Application Decision <br />Dear Mr. Siegrist: <br />Pursuant to Rule 1.4.5(6), on August 4, 1995 the Division of <br />Minerals and Geology decided to recommend that the Colorado Mined <br />Land Reclamation Board approve with conditions your 112 Amendment <br />Application to the Sandy Acres Pit Permit. The conditions, <br />outlined below, are necessary in light of the currently approved <br />mining plan which allows mining within 10' of property lines. <br />STIPULATION NO. 1 <br />The operator will maintain all above and below water slopes during <br />mining at a 3:1 grade. The northern and eastern slopes which have <br />previously been mined to less than 150' of the fence will be <br />backfilled with overburden and wash fines to achieve 3:1 slopes to <br />10'below the water level and 2:1 slopes to the pit bottom. <br />Alternatively, operator may submit the additional bond required to <br />import sufficient pit-run material to achieve the above and below <br />water grades of 3:1 and 2:1 outlined in the reclamation plan. The <br />volume of pit-run required to augment on-site stockpiled material <br />is estimated by the Division at 508,000 yds. The cost per yard is <br />estimated at $8.00/yd. for a total additional cost of <br />$4,064,000.00. <br />The Division has reviewed the estimate of reclamation costs <br />supplied by the operator. If the operator agrees to maintain 3:1 <br />slopes during mining, the required reclamation bond has been <br />calculated at $133,000.00. The bond is currently set at <br />$92,370.00. The operator must submit a rider to the current bond <br />