Laserfiche WebLink
• <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St.. Room 275 <br />Denver, CO 80203 <br />Phone: (7031 866-3567 <br />FAX: 13031832-8106 <br />December 14, 1992 <br />iii iiiiiiiiiiii iii <br />STATE OF COLORADO <br />Mr. Warren Wilcox <br />Gunnison Gravel <br />P.O. Box 42 <br />Gunnison, Colorado 81230 <br />RE: Revision Adequacy, Dickerson Granite Pit <br />Revision No. TR-02 <br />Dear Mr. Wilcox: <br />Permit No. M-78-305, <br />of oOro <br />„e j <br />~6 <br />• rl Q . <br />~r a <br />Ray Romer <br />Governor <br />Michel B. Long <br />Division Director <br />Additional information and clarifications are required for your technical <br />revision submittal to be considered adequate for approval under the Colorado <br />Mined Land Reclamation Act. Please respond to each item on the following list <br />prior to January 8, 1993 in order to resolve any outstanding issues prior to <br />the January meeting of the Mined Land Reclamation Board. Correspondence <br />received from the National Park Service detailing their concerns with this <br />pit, as well as your response to Park Service concerns, were given <br />consideration in compilation of this list. <br />Submit a plan showing how runoff from disturbed areas, piled materia] and <br />operating surfaces will be managed to protect against pollution of <br />surface water both during and after the operation. <br />Rule 6.1 of the Mineral Rules and Regulations of the Mined Land <br />Reclamation Board requires that "grading shall be carried on so as to <br />create a final topography appropriate to the final land use". Rule <br />6.1<6) states that "maximum slopes and slope combinations shall be <br />compatible with the configuration of surrounding conditions and selected <br />land use". In accordance with these regulations, and considering that <br />the pit is within a National Recreation Area, measures to blend the mined <br />area with the surrounding topography will be required for final <br />reclamation, and a cost for creation of rounded, irregular contouring <br />will be included in the required bond. Please commit to implementaton of <br />such measures as part of your reclamation plan, <br />Please commit to a post-reclamation configuration in which no slopes will <br />exceed 2:1 except where existing slopes already exceed 2:1. The <br />topographic map submitted with this revision will be used to determine <br />existing slope gradients. <br />Submit a description of the methods of mining to be employed in each <br />stage of the operation, including a description of the mining and <br />processing equipment to be utilized. <br />