Laserfiche WebLink
<br />• iii iiiiiiiiiiiuiii , <br /> <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmem of Nawral Resources <br />1313 Sherman St., Room 215 y <br /> <br />Denver, Culorado 80203 Il <br />~ <br /> <br />Phone 0031 A66~3567 I <br />FAX: 0031 832-810h <br /> DEPARTMEtdT OF <br /> NATURAL <br />August 8, 1995 RESOURCES <br /> Roy Romer <br />Ms. Sally Hayes co~rmor <br />Battle Mountain Resources <br />InC IamesS Lochhrad <br />, <br />. <br />P.O. Box 310 E~ecul rve Director <br /> M~ehari a ~nnti <br />San Luis, CO 81152-0310 D~~~:~o~ Di~rcwr <br />RE: Phase II, Raise 2, Embankment Design Report, Sau Luis Project, <br />Permit No. M-88-112 <br />Dear Ms. Hayes: <br />I have received and reviewed SRK's Embankment Design Report which addresses the <br />geotechnical suitability of the tailings material as a foundation for phase II raise 2 of the <br />tailings embankment. Pursuant to the approved permit, BMRI is required to verify <br />embankment design assumptions prior to construction of raise 2 through monitoring <br />(piezometers), testing (cone penetrometer probes, etc.) and stability modeling (static and <br />dynamic conditions). <br />Section D.6.5.4. I of the approved permit states "raises will be of an upstream construction <br />type and will be placed on dewatered consolidated tailings". SRK recognized, from the <br />available test data, there is an interval of "saturated" tailings that will underlie a portion of the <br />upstream section of raise 2. As a result, SRK completed a very thorough pseudostatic model <br />of the embankment, considering liquefaction conditions in the tailings, using the required .15g <br />seismic coefficient. The results of the modeling effort indicate that the embankment, in <br />general, would remain stable even though there is potential for some deformatioc during the <br />MCE (maximum credible earthquake). SRK predicts "the displaceme)t alo2:g thn critical <br />potential failure surface for the downstream face" (predicted to occur a[ the interface of the <br />VLDPE liner and the bottom of the main embankment) "is estimated ro be on tha order ojl-3 <br />feet jot a PGA (peak ground acceleration) of 0.6 g arising from a magnitude 7+ earthquake. <br />For the upstream face of the embankment raise, and a PCA of 0.6g, the displacement is on <br />the order of /-/.S jeer". SRK predicts there will be some defonnation (settling) of the tailings <br />and [he upstream face of raise 2 during the post-liquefaction phase of a seismic even[. Since <br />the upstream crest of raise 2 will be founded on approximately 20 feet of saturat~zd tailings, <br />and the downstream crest founded on 16 feet of unsaturated tailings, there could be .6 and .5 <br />feet of settlement beneath the upstream and downstream crests of the raise, respectively. <br />However, even though the pseudostatic models imply that the conceptual raise design provides <br />a stable structure, the fact remains: saturated tailings exist within the foundation material <br />proposed for raise 2. <br />