Laserfiche WebLink
lIII IIIIIIIIIIIII III <br /> ' .. and washing equipment including screens, conveyors anu <br /> generators and such support equipment as pick-up trucks , <br /> ' water trucks, welding sets, maintenance equipment and <br /> trailers. Equipment used on site will be parked there <br /> ' when idle. Equipment storage will not cause erosion, <br /> landslides or other hazardous conditions. <br /> ' Crushing and washing equipment will be located southeast of <br /> the existing lake. Stockpiles will generally be located <br /> west of the plant to provide visual and noise buffers. Water <br /> used at the plant will be recycled via settling ponds in <br /> the southeast 12 acres of Stage 1. Application has been <br /> made to the water court for industrial water at this site. <br /> ' Staging. Mining will occur at successive locations on site. <br /> As mining is completed in one area, reclamation will <br /> fbegin. The following sequence is anticipated. <br /> 1 Stage Location Acreage _ <br /> 1 Southeast central 33 <br /> 2 North 20 � <br /> 3 North central 5 <br /> 4 South 27 <br /> 5 2QzsWV central--vest 16�.5i d3 <br /> B-7 $►-�2 <br /> JJ <br />