Laserfiche WebLink
' It is difficult to estimate accurately the exact number of <br /> years gravel production could occur at the site because <br /> consumer demand and general economic conditions cannot <br /> be predicted. Nor can the exact market share of a single <br /> ' producer be predicted. Mining is anticipated to last <br /> ' 17 to 25 years at the Deepe Farm site. Estimates of <br /> production, land disturbance at a given time and equipment <br /> use are made based on the best information now available. <br /> 1 <br /> 1 <br /> ' s-8 <br />