Laserfiche WebLink
<br />iii iiiiiiiiiiiuiii ~ <br />DAILY REPORT <br />PROJECT NAME <br />REPORT DATE <br />SAN LUIS <br />4/7/97 <br />PROJECT NUMBER: 1473'?.00 <br />T0: DAVE HALLMAN, SRK PROJECT ENGINEER <br />FROM: GLENN GUYER, SRK SENIOR FIELD TECHNICIAN <br />SUBJECT: RECLAMATION REVIEW WITH THE STATE OF COLORADO AND BATTLE <br />MOUNTAIN GOLD REPRESENTATIVES FOR DESIGN OF THE TAILING: <br />IMPOUNDMENT SPILLWAY, THE DESIGN FOR FUTURE DRAINAGE ACROSS THE <br />TAILINGS IMPOUNDMENT AND WEST PIT RECLAMATION DRAINAGE PLAN. <br />At 1430 hrs. Dave Hallman and I made <br />reclamation report and several prints <br />Alamosa and checked into a motel. <br />copies of the west pit <br />of the west pit. 7: drove to <br />C <br />Glenn r, SR i Representative <br />DALY47.WP6 <br />